Brampton Arterial Road Rehabilitation
4.2km full-depth reclamation of deteriorated urban arterial road, including curb, gutter, and signal upgrades.
Our Work
Delivering complex civil infrastructure on time and on budget — from urban arterial roads to watershed-scale drainage systems.
4.2km full-depth reclamation of deteriorated urban arterial road, including curb, gutter, and signal upgrades.
86m single-span steel girder footbridge connecting riverside trail networks across the Humber River valley.
Wet pond and bioswale system designed to manage 100-year storm events for a 340-hectare greenfield development.
Full condition assessment and repair specification for 12 bridge structures along a 7km corridor.
6.8km of new collector and local road network serving a 180-hectare industrial employment land area.
2.1km of 1200mm diameter reinforced concrete trunk sewer installation using open-cut and microtunnelling methods.
Our engineering team would be glad to review your scope and advise on approach.